Monday, March 31, 2014

Week 53 - Fireplace Steel, Rails, Landing, Redwood + Hardscape

As we race to finish line, this week we saw quite a few of the final items coming together.  The blackened steel facia fireplace surround was assembled on-site and then installed in the fireplace opening, the interior rails were completed, the exterior landing was fabricated, the interior redwood was was installed, and the the formwork for the exterior hardscape was prepared.  Below are a series of progress pictures of some of the highlights from the week.