This was a big week at the house - we finally saw installation of the exterior stair beam and cantilevered cast concrete treads.  While we love the way the stairs look now, we will indeed have railings also installed.  We also saw installation of the finish plumbing - including our hotly anticipated master bathroom bathtub.  While all the interior work was going on, the painters were also there painting the walls and ceilings.  Lastly, the site concrete form-work was also removed to reveal the board formed concrete - and the site was was graded and prepared for the paver steps.  Below are status pictures of the various items throughout the house and the site.