Week 46 - Catwalk, Tiles, and Floors

This week we saw the contractors get closer and closer to completing the finishes in the house.  The steel fabricators have put most of the pieces to the catwalk and internal stairs together, the tile setters have installed most of the tiles throughout the house and have started grouting, and the flooring installers moved up the second second floor.

Catwalk and Stairs:




Master bathroom Heath tile wall:



Flooring in the kitchen and family room:


Below is a detail photograph showing one of our favorite elements of the house - the drywall shadow-line.  The drywall ends about 1/2 of an inch above the floor with the floor extending under the drywall and a 1/4 of an inch of cork expansion joint under the reveal.  Yep - no baseboard - just a slick reveal.  Our motto - no two materials shall ever meet.