Now that we are completely roughed-in with the electrical and plumbing, the dry-walling begins. The crews started with the ceilings and the apartment. The walls of the main house still need to have all the UMB installed so that we get a shadow-line where the drywall meets the flooring. Over the next two weeks the remaining drywall will be installed and finished to a level 5. Below are initial pictures of the dry-wall - more to come over the next two weeks as it is completed.