Now that the foundation work is complete, the contractors started the floor and sheer wall framing. Below are pictures of the floor framing in the family room and kitchen. The original framing had this part of the second floor stepped down and at a different level from the rest of floor. Now the whole floor will be the same level.
No comments:
Post a Comment