This week marked the excavation of the basement under the house in order to expand the downstairs apartment. From the pictures below you can see the floor separating the apartment and the lower garage was removed and the north wall was excavated and pushed out back under the house. A concrete retaining wall was then poured. The next steps are to excavate the west wall and then replace the floor.
And a picture of the architect examining the work.
No comments:
Post a Comment